
The city apparatus continues Capital GardensUnder the chairmanship of Engineer Ahmed El-Arabi, he conducted extensive field tours to follow up on the ongoing development work within the agency’s plan to follow up on infrastructure work, road pavements, maintenance of green spaces and lighting poles, which serve the entire residential projects within the presidential initiative “Housing for All Egyptians,” the low-income axis of the Tenth Declaration, and to determine the actual needs in each region, ensuring the speed of dealing with any comments and raising the level of services provided to citizens.
His tour included several different areas in the residential buildings at sites Nos. (75, 76, 77, 78, 79, 80, 81, 82) in the fourth phase of the Al-Zuhur neighborhood, where he followed the ongoing efficiency improvement work, directing the intensification of cleaning work and attention to the cleanliness of the internal streets and around the buildings, and the removal of debris resulting from development work, in addition to paying attention to agricultural work, tree pruning, thickening of covers and flowers, and cleaning of green spaces. In order to preserve the civilized appearance.
Rehabilitation of roads and sidewalks
He also followed up the work of rehabilitating roads and sidewalks and raising their efficiency after making observations, in addition to completing the interlock work. He emphasized cleaning manholes and drains and installing missing covers to ensure the efficiency of water and drainage networks. He also followed up on the maintenance of lighting poles, which requires turning on the electricity to know which poles require maintenance and changing the lights, explaining that the goal of these efforts is to provide a safe environment and a civilized appearance befitting the Egyptian citizen.
He stressed that the maintenance and development plan is proceeding according to a scientific methodology aimed at achieving sustainability in public facilities, enhancing the quality of life, and preserving the aesthetic image of the Capital Gardens City as one of the promising cities of the fourth generation that is witnessing accelerated rates of achievement in various fields.
Engineer Ahmed Al-Arabi, head of the agency, confirmed that he is closely following the progress of work in the field within all sectors, noting that the work teams are working around the clock to ensure the continued efficiency of services and provide an integrated urban environment for citizens.








