
Sunday 15/February/2026 – 03:05 AM
The electricity sector in Kafr El-Sheikh Governorate announced the disconnection of electricity from the “industrial” and “sewage” feeders in the new Bella electricity distribution board, today, Sunday, as part of carrying out the necessary periodic maintenance work to improve the efficiency of the network and ensure the stability of the electrical supply.
The electricity sector in Kafr El-Sheikh explained, in a statement issued today, that the disconnection of the power will start from eight in the morning until one in the afternoon, indicating that the Abu Rakha area will be affected by the power outage as a result of disconnecting the “industrial” feeder, while the impact of disconnecting the “sewage” feeder includes both Al-Faluga Street and the Al-Taqwa area.
The electricity sector confirmed that maintenance work comes within a periodic plan aimed at raising the efficiency of feeders and reducing sudden malfunctions, which contributes to improving the level of service provided to citizens and ensuring the continuity of power in a safe and regular manner.
The electricity sector appealed to citizens, business owners, and government and service establishments located within the affected areas to take the necessary measures to provide their basic needs that depend on electricity during the outage period, until maintenance work is completed and power is restored on time.








