
Sunday 12/April/2026 – 04:15 AM
Engineer Iman Ahmed Abbas, head of the Central district, paid In AlexandriaWith a massive campaign to stop 2 illegal acts, in Moharam Bey and the Mahmoudiyah Qalbi axis, within the framework of confronting illegal acts from the beginning and enforcing the law.
Details of the campaigns in the Central District of Alexandria
It resulted in the cessation of restoration work without a license on the facade of the property located on Al-Dhafer Street in Muharram Bey, in addition to demolition and construction work without a license in Muharam Bey in an apartment on the ground floor of the same property.
The work was stopped, the equipment and tools used were seized, and the engineering department was referred to take all necessary legal measures.
In addition to stopping work without a license on the mezzanine of the property located on Mahmoudia Qebli Road, which includes internal and external finishes and distortions, the works were stopped, the equipment used (winch) was seized, and the engineering department was referred to take the necessary measures regarding the incident.
The head of the Central Alexandria District called on citizens to adhere to the laws regulating construction, demolition, and finishing works, while emphasizing the continued work of neighborhoods to serve the citizen.








